Plus 90 Mall New Cairo occupies a 4,483 m² plot with a 52 metre frontage directly on North Teseen Street, and Hamat Properties has already carried the structure to roughly 50% completion on site. That construction progress is the single fact that separates this address from most of what is being sold around it. A buyer signing today is committing to a half-built commercial, administrative and medical building on the busiest retail axis in New Cairo (Fifth Settlement), with handover scheduled for 2028 rather than to a plot that has yet to break ground.
The plot size shapes the offer as much as the progress does. Forty-eight units sit across a ground floor of restaurants and cafes, a first floor of shops, and a second floor of offices and clinics, above two basement levels given over to parking and storage. A count that small on a street this commercial limits how much stock can ever come to market from this particular building, and that scarcity is the argument the pricing rests on.
Where exactly does the mall sit on North Teseen Street?
Plus 90 Mall New Cairo stands directly on North Teseen Street in the Fifth Settlement, facing El Marasem Mall, with a Rotana hotel on the same stretch. The site sits minutes from Al Rehab City and the Suez Road, and Mivida adjoins its catchment. Its 52 metre frontage faces the street itself.
North Teseen Street functions as the first commercial and administrative artery of New Cairo, carrying thousands of vehicles a day between the residential districts on one side and the outer axes on the other. El Lotus, El Qarnfel and Tamr Henna feed the mall from the immediate north and west, while Mivida and Al Rehab supply a settled, higher-income customer base that does not depend on the project delivering new residents of its own. This is the distinction worth paying for on this street: the demand already exists and is already housed.
The American University in Cairo and the education cluster around it add students, faculty and visiting professionals to that base, which matters for the ground floor food and beverage units more than for the offices. Two operating retail destinations, The Grid and Blue Waters, sit nearby, and their presence works in the mall’s favour rather than against it, because clustered destinations raise footfall across a whole stretch instead of splitting it. One gap is worth naming: the Arabic source publishes travel times in minutes only, and does not state distances in kilometres to any landmark, so anyone modelling catchment radius should measure it independently.
How the floors are stacked, and why the clinics sit above the food court
Serry Design handled the architecture, specifying glazed façades that pull daylight through the retail levels and a 6 metre shopfront width for each store. That frontage figure is the practical detail for a retail tenant, since display width governs how much of a product range can be read from the circulation route. The mall separates its activities vertically instead of mixing them on each level, which is the decision that most affects how each unit type will actually trade.
Two basement levels take parking and storage. The ground floor is given entirely to restaurants and cafes with outdoor seating in front, the first floor to shops, and the second floor to administrative offices alongside the medical units. Placing consulting rooms and offices a full level above the food and beverage traffic keeps patient and client privacy intact while shoppers circulate below, and it is the reason the second floor can be sold to doctors and firms rather than only to retailers. Wide circulation zones and seating areas were allocated through the plan to extend dwell time at ground level.
Dr. Walid Abdel Ghaffar acted as electromechanical consultant and supervises the smart control systems for air conditioning, lighting and audio. KPI’S Real Estate holds the exclusive marketing mandate. Neither appointment changes a unit’s price, but both indicate that the technical and commercial sides of the project were placed with named parties rather than handled in-house.
Unit mix and areas
The mall distributes 48 units across three trading levels, and the split is deliberately uneven. The ground floor holds 16 units reserved for restaurants and cafes, the first floor holds 15 shops, and the second floor holds 17 administrative offices together with the medical units. Areas on the first and second floors begin at 58 m², a size that suits a specialist retailer, a small practice or a startup office equally.
| Floor | Activity | Units | Area from | Price per m² | Total from |
|---|---|---|---|---|---|
| Ground | Restaurants and cafes | 16 | Not published | up to EGP 330,000 | EGP 24,750,000 |
| First | Retail shops | 15 | 58 m² | from EGP 314,000 | EGP 14,779,000 |
| Second | Offices and clinics | 17 offices plus medical units | 58 m² | from EGP 160,000 | EGP 17,424,099 |
Three gaps in that table deserve to be read as gaps rather than skimmed past. No maximum area is published for any unit type, so the top of each size band is unknown and a buyer cannot tell whether a 200 m² office exists. The ground floor publishes no minimum area at all, which means the cheapest food and beverage unit cannot be sized from the source. The medical units are counted with the offices rather than separately, and they carry no rate, no area range and no ticket of their own, so any clinic price has to be confirmed unit by unit.
What does a square metre cost at Plus 90 Mall New Cairo?
Prices at Plus 90 Mall New Cairo start from EGP 160,000 per m² for second floor offices and clinics, from EGP 314,000 per m² for first floor shops, and reach EGP 330,000 per m² on the ground floor. These rates were updated in June 2026 and vary by level and by position within the building.
The spread follows the logic of frontage and footfall. The ground floor is the building’s face and the first point a visitor meets, so it carries the highest rate, and the ground figure is published as a ceiling that the level reaches rather than as a floor it starts from. The second floor sits furthest from passing trade and prices roughly 49% below the first floor on a per metre basis, which is the discount an office or a clinic pays for not needing walk-in traffic. Note what these numbers are and are not: they are bare rates under the heading price per metre, not instalment-inflated figures, and the source attaches no financing cost to them.
Two conditions turn every figure above into a zero-discount list price. A cash discount is offered but its percentage is never stated, so the published rate is the highest price anyone would pay rather than the price a cash buyer would pay. A maintenance deposit of 10% is charged separately at handover and sits on top of the ticket, not inside it. Prices are also expected to move as construction advances, so the June 2026 rates should be treated as a reference point and confirmed before any reservation.
Do the entry tickets reconcile with the published rates?
This is the check most listings skip, and on this project it does not come out clean. Dividing each published entry ticket by its own floor’s published rate produces three different answers, and only one of them is tidy. The exercise is worth running before treating any headline figure as the price of the cheapest unit.
- Ground floor. EGP 24,750,000 divided by EGP 330,000 gives exactly 75 m². The arithmetic closes, but it closes on the rate the floor reaches, not a rate it starts from, and 75 m² appears in no published area row.
- First floor. EGP 314,000 multiplied by the published 58 m² minimum gives EGP 18,212,000, which is EGP 3,433,000 above the stated entry ticket of EGP 14,779,000. Read the other way, that ticket buys about 47 m² at the published rate, or implies a rate of roughly EGP 254,810 per m² at 58 m². Neither the area nor the rate appears anywhere in the source.
- Second floor. EGP 160,000 multiplied by 58 m² gives EGP 9,280,000, while the stated entry ticket is EGP 17,424,099, some 87.8% higher. That ticket corresponds to roughly 109 m², which is nearly double the published minimum area.
Two consequences follow for a buyer. First, the headline figure of EGP 14,779,000 belongs to the first floor retail row alone and does not describe the mall as a whole, yet it does not buy the smallest published unit in its own row either. Second, the value ladder runs backwards at ticket level: the second floor prices 49% lower per metre than the first floor but carries an entry ticket 17.9% higher, which can only hold if second floor entry units are far larger than first floor ones, even though both rows publish the same 58 m² minimum. Ask the sales desk which specific unit, on which floor, at which area, each quoted total refers to, and get it in writing before reserving.
Payment terms and what they cost per month
Hamat Properties publishes a single payment structure rather than a menu of alternatives, which makes comparison straightforward. The booking down payment starts at 20% of the unit value and the balance is spread over a term reaching six years, with a cash settlement attracting a special discount.
- Booking down payment from 20% of the unit value.
- Balance in instalments over a term of up to 6 years.
- A special discount on full cash settlement, with no percentage published.
- A maintenance deposit of 10% payable on handover, charged on top of the purchase price.
Applied to the published entry tickets over the full 72 month term, the numbers are concrete. A first floor shop at EGP 14,779,000 needs EGP 2,955,800 down and roughly EGP 164,211 a month. A second floor office or clinic at EGP 17,424,099 needs EGP 3,484,820 down and roughly EGP 193,601 a month. A ground floor unit at EGP 24,750,000 needs EGP 4,950,000 down and exactly EGP 275,000 a month.
Budget for the maintenance deposit as a separate line at handover, because it is substantial: EGP 1,477,900 on the first floor ticket, EGP 1,742,410 on the second, and EGP 2,475,000 on the ground floor. A first floor buyer therefore faces EGP 2,955,800 at signing and a further EGP 1,477,900 at delivery, on top of every instalment paid in between. Treat any figure quoted elsewhere as a 10% down payment with caution, since 10% is the maintenance deposit in this project’s own terms, not its entry deposit.
Read More: The Wave Mall New Cairo
When does the mall hand over, and in what condition?
Plus 90 Mall New Cairo begins handover by 2028, roughly a year and a half out, on a schedule that rests on construction already standing at about 50% on site. Retail units are delivered core and shell. Administrative units are delivered fully finished with air conditioning systems installed.
That finishing split carries real money with it. A shop owner receives a bare shell and fits it to the brand’s own specification, which adds cost but allows a restaurant or a fashion tenant to build what the activity needs. An office or clinic buyer receives a working space with cooling already in place, which cuts the cost and the delay of getting to the first trading day. Read against the 2028 date, the fully finished administrative product is the faster route to occupancy of the two. No delay penalty or handover guarantee is stated in the source, so the completion date should be treated as a schedule rather than a contractual commitment unless the reservation form says otherwise.
Facilities and who operates them
MRB, a company specialising in operating commercial projects, manages the mall’s services. An operator appointed before delivery matters more in retail than in residential, because footfall, tenant mix and common area condition decide whether a unit holds its rent. The published facilities are specific rather than generic.
- 140 parking spaces in total across the two basement levels, serving visitors and staff.
- 6 passenger lifts distributed through the building, plus a dedicated goods lift for the shops and restaurants.
- Escalators linking the ground floor to the first floor to move shoppers between the two retail levels.
- An integrated security system with surveillance cameras and a security team on duty around the clock.
- Smart control systems for air conditioning, lighting and audio, supervised by Dr. Walid Abdel Ghaffar.
- A ground floor food and beverage zone of 16 units with outdoor seating in front.
The parking figure repays a second look. 140 spaces serve 48 commercial units and their customers, which works out at under three spaces per unit before any staff vehicle is counted. On a street where kerbside parking is already contested, that ratio is the operational constraint most likely to be felt on a busy evening, and it is worth raising with the operator before committing to a food and beverage unit that depends on evening trade.
Hamat Properties as a developer
Hamat Properties is an Egyptian developer concentrating on commercial, administrative and investment projects, with an active presence in both New Cairo and the New Administrative Capital. Its own site states more than 20 years of experience, an investment volume of around EGP 15 billion and a team exceeding 150 people. The company publishes no founding year and no verified total of delivered units, and those blanks should be read as blanks rather than filled in from third party copy.
Its clearest completed reference is Za Link in the New Administrative Capital, a mixed-use building in the MU23 district on plot C3. Za Link occupies 4,085.85 m², rises ground plus nine floors, and contains 286 units, of which 54 are commercial across the ground and first floors and 232 are administrative across the remaining eight. That profile is close enough to this mall in scale and format to serve as a genuine reference point rather than a name on a list.
Read More: Three Sixty Mall New Cairo
In October 2025 the company announced a strategic alliance with the French firm Demobat to develop this project, with investments stated as exceeding EGP 3 billion. That figure deserves a caveat: measured against the mall’s own published price list, 48 units at the stated rates do not approach EGP 3 billion in sales value, so the announced investment should not be read as this building’s construction cost or its gross sellable value. Press reporting in May 2026 put the group’s portfolio at six commercial projects and more than 52 land plots, with targeted sales of EGP 4 billion for the year against EGP 2 billion the year before.
The investment case, and what the source does not tell you
Three stated facts support the commercial argument here, and they are worth separating from the marketing around them. The location sits on North Teseen Street inside a fully built residential catchment, so customer flow does not depend on future occupancy. Construction at about 50% shortens the wait to 2028 and reduces completion risk relative to a project starting from zero. The mix of retail, office and medical space widens the pool of possible tenants, which supports occupancy across a cycle better than a single-use building would.
Now the absence that matters most. The source publishes no return on investment, no rental yield, no expected rent per metre and no payback period for any unit type, and it names no guaranteed return, no guarantor and no guarantee term. Nobody can calculate a yield from a purchase price alone, and any percentage quoted to you without a matching rent figure and a stated lease term is an assertion rather than a calculation. Ask for the rent assumption in writing, divide it yourself, and treat the result as an estimate.
The project suits an investor seeking a leasable commercial unit in a high-demand catchment, and an owner-operator wanting to open a shop, a clinic or an office on a street that already trades. It suits less well anyone needing income now, since the handover horizon is 2028 and no interim rental arrangement is published, and it offers nothing to a residential buyer. The 10% maintenance deposit is a real additional cost at delivery, though it funds professional management through MRB, which is what protects the asset’s value after handover. This analysis is offered for guidance only and is not investment advice.
Questions buyers ask about this mall
Is it called Plus 90 or 90 Plus?
The correct name is Plus 90 Mall New Cairo. The developer’s own announcement of its partnership with Demobat uses Plus 90 throughout, and Hamat Properties refers to the project the same way in its corporate material. Several property portals invert it to 90 Plus in page titles while their own body text says Plus 90.
Read More: The Node New Cairo
What is the cheapest unit in the mall?
The lowest published total at Plus 90 Mall New Cairo is EGP 14,779,000, which the source attaches to the first floor retail row rather than to the mall generally. Because the ground floor publishes no minimum area, a smaller unpriced unit may exist on that level, so confirm availability by floor.
Are the clinics priced separately from the offices?
No separate price is published for the medical units at Plus 90 Mall New Cairo. The source groups clinics with the 17 second floor offices under a single rate from EGP 160,000 per m² and a single entry total, with no clinic count, no dedicated area range and no dedicated ticket of their own.
How many parking spaces come with the mall?
Plus 90 Mall New Cairo provides 140 parking spaces in total across its two basement levels, serving both visitors and staff for all 48 units. Some listings state 140 spaces on each level, which would double the real figure. The published total for the whole building is 140.
The short version
Plus 90 Mall New Cairo offers retail, office and medical space on a 4,483 m² plot fronting North Teseen Street, already about 50% built and scheduled for handover in 2028, with areas from 58 m², a 20% down payment, instalments over six years and operation by MRB. The short delivery horizon and the settled catchment are its strongest arguments. Its published entry tickets do not reconcile with its published rates, so verify the exact unit behind any quoted total.
To confirm current prices by floor or arrange a site visit while construction is under way, send your details through the form on this page.