Delivery 2028 Fifth Settlement

Pixel Business Center New Cairo

Pixel Business Center New Cairo by Safwa Urban Development: offices, clinics and shops from 45 m2 in the Banks Complex, from EGP 10M with 15% down.

Prices change frequently
3,700 m2
Area
2028
Delivery
Fifth Settlement
Location
ABOUT THE PROJECT

About the Project

Pixel Business Center New Cairo is a commercial, administrative and medical mall developed by Safwa Urban Development (SUD) on a 3,700 m² plot inside the First Sector of the Banks Complex, New Cairo (Fifth Settlement), with its frontage directly on North 90th Street. What separates this building from the rest of the 90th Street retail stock is not its size but its neighbours. It stands beside the National Bank of Egypt and Banque Misr and opposite the Administrative Prosecution, which means the footfall passing its ground floor is made up of bank employees, lawyers and people with business at a government authority rather than weekend shoppers.

Units at Pixel Business Center New Cairo start from EGP 10,000,000 against a rate that starts at EGP 170,000 per square metre, payable from a 15% down payment with the balance spread over up to six years. Those figures were published for 2026 and they carry an arithmetic problem worth understanding before you read any further, because the headline ticket does not divide cleanly into any unit size the project actually publishes. The sections below work through what is stated, what is derived, and what the source leaves blank.

Why the Banks Complex address defines this mall

Safwa Urban Development placed the project inside the First Sector, the oldest and most fully occupied of the Fifth Settlement’s sectors, rather than in one of the districts still filling up. That matters commercially: a retail unit here opens into an existing customer base instead of waiting several years for one to form. The First Sector’s banking cluster along North 90th Street is also effectively closed to new entrants, since the plots zoned for it were allocated long ago and no comparable land is coming to market.

The immediate neighbours do most of the work. The National Bank of Egypt and Banque Misr sit alongside the plot, and the Administrative Prosecution faces it, which concentrates three specific tenant categories in walking distance: banking back-office staff, law firms that need to be near the prosecution building, and the consultancies that service both. A glass façade fronting the street was chosen precisely to convert that passing traffic into visibility for the ground-floor shops.

Beyond the immediate block, the mall draws on a wider catchment. The Ring Road and the Suez Road connect it to eastern Cairo, Nasr City and older Cairo, while Cairo Festival City Mall, the American University in Cairo and the Police Academy sit within the same district and feed it students, staff and visitors. Traffic between the Fifth Settlement and the New Administrative Capital adds companies whose work is tied to the government bodies that have relocated east, and Cairo International Airport keeps the address usable for firms hosting international partners.

One honest caveat belongs here. The Arabic source for this project publishes no distance in kilometres and no drive time to any of those landmarks, so none is stated on this page either. Several listing sites circulate minute figures for the mall, including five minutes to the New Administrative Capital and eight minutes to Cairo International Airport. Both are physically impossible from the Fifth Settlement banks cluster at any lawful speed, and one of those pages also places the mall three minutes from North 90th Street when the developer’s own description puts the building on that street’s frontage. Treat any published drive time for this address as marketing rather than measurement.

Read More: The Node New Cairo

How 3,700 m² becomes a nine-level building

The plot measures 3,700 m² and the developer built on roughly 25% of it, which puts the building footprint at about 925 m². One listing page independently publishes a 930 m² footprint on a 3,707 m² plot, close enough to confirm the coverage ratio even though its plot figure differs by seven square metres from the developer-sourced number used here. That same page then describes the uncovered 75% as green space, which it is not. The remainder became a plaza and landscaped forecourt in front of the façade, giving the shops and cafés an outdoor seating area instead of pushing them straight onto the pavement. Either way the coverage is unusually low for a commercial plot on this axis, and it is the reason the building reads as a business address with a forecourt rather than a box filling its boundary.

Vertically the scheme runs to nine levels: two basements, a ground floor and six upper floors. Both basements are given over entirely to parking and building services, which frees the whole ground-floor perimeter for retail frontage and keeps queuing cars off the North 90th Street kerb. Retail occupies the ground and first floors where street visibility is worth the most, while the administrative offices and medical clinics sit on the floors above, separated from shopper traffic so that a law firm or a doctor is not sharing a lobby flow with a coffee queue.

A 925 m² floor plate is small, and the consequence runs straight to the investment case. Fewer units fit into the building than into the larger malls further along the axis, which limits how many shops end up competing for the same customer inside the same lobby. The developer has not published how many units the mall contains, so the scarcity argument rests on the footprint arithmetic rather than on a stated unit count. Safwa Urban Development describes the specification as fourth-generation mall standard and says the glazed façade moderates internal temperature and cuts year-round energy use, but the engineering consultancy behind the design is referred to only as an unnamed practice, so no designer is credited on this page.

Unit types and sizes across the three activities

Three activities share the building, and each one is pinned to a different part of it. The smallest units in the scheme are 45 m², which suits a single-practitioner clinic or a two-desk office, and the largest published size is a 120 m² administrative floorplate. Units can be combined where a company needs a bigger headquarters, which gives a buyer some ability to size the unit to the business rather than the other way round.

Unit typePosition in the buildingPublished area (m²)Maximum published
Retail shopsGround and first floorsFrom 60Not published
Administrative officesUpper floors45 to 120120 m²
Medical clinicsUpper floorsFrom 45Not published

Read the right-hand column carefully, because two of the three rows publish a floor area with no ceiling. Only the administrative offices carry a stated range, so the retail and clinic rows tell you the smallest unit available and nothing about the largest. That is a genuine gap rather than an oversight on this page, and any quoted “largest available shop” should be checked against a live inventory list rather than assumed from the office row’s 120 m².

The retail units on the ground and first floors start at 60 m² with frontages facing the external circulation, a size that works for a small bank branch, a brand outlet or a services counter. The administrative offices above target the consultancies and law practices that want to be within a short walk of the Administrative Prosecution and the two banks. The clinics occupy the same upper floors and are aimed at doctors who want a central Fifth Settlement address patients can reach from across the district. No row publishes a price of its own, which is where the next section becomes necessary.

What does a unit at Pixel Business Center New Cairo actually cost?

Pixel Business Center New Cairo publishes unit prices starting from EGP 10,000,000 and a rate starting from EGP 170,000 per square metre, updated for 2026, with the final figure varying by unit size, floor and position inside the building. No discount schedule is published, so both numbers are zero-discount list values.

Two separate price bases sit side by side in that statement. One is a total ticket expressed per unit, the other is a bare rate per square metre, and neither is labelled as a cash price or an instalment price. Because the only payment structure published for the mall is the 15% down payment over six years, there is no cash column to compare against, and a buyer cannot tell from the source whether financing is already priced into the EGP 170,000 or sits outside it. Maintenance is never mentioned anywhere in the source, which means it should be assumed chargeable on top of these figures until the developer confirms otherwise.

Now divide the headline by the rate. EGP 10,000,000 at EGP 170,000 per square metre buys 58.8 m², and no published row in this mall contains a 58.8 m² unit. It falls between the 45 m² floor of the offices and clinics and the 60 m² floor of the retail units, which makes the headline a figure belonging to neither band. The smallest unit the project actually publishes, a 45 m² office or clinic, works out at EGP 7,650,000 at the stated rate, which is EGP 2,350,000 below the advertised starting price. Run it the other way and the contradiction is the same size: if EGP 10,000,000 really is the entry ticket for a 45 m² unit, the effective rate is EGP 222,222 per square metre, roughly 31% above the EGP 170,000 the same page advertises.

The retail row lands closer but still misses. A 60 m² shop at EGP 170,000 per square metre costs EGP 10,200,000, which is EGP 200,000 above the stated starting price rather than equal to it. So the honest conclusion is that the EGP 10,000,000 headline does not buy the smallest unit in the building, does not match the retail minimum either, and cannot be attributed cleanly to any one activity. A buyer should ask for a priced inventory row showing unit number, activity, floor, area and total before treating EGP 10,000,000 as the entry point. The largest published unit, a 120 m² office, prices at EGP 20,400,000 on the same rate.

For context on the axis, the source places other administrative and commercial malls on North 90th Street in an EGP 8,000,000 to EGP 15,000,000 per unit band, which puts this project in the middle of that range. Outside that source the picture collapses completely. Seven listing pages for this same mall publish seven different entry tickets: EGP 1,164,000, EGP 5,395,500, EGP 7,589,787, EGP 7,758,449, EGP 8,062,040, EGP 8,562,040, and one page whose price field renders as zero. One of those pages carries two different starting figures inside its own layout, a headline of EGP 8,562,040 sitting above a unit module offering 45 m² at EGP 7,589,787. Another presents EGP 170,000 as a total starting price in its specification box and as a per-metre price in its body text, the same number doing two incompatible jobs.

None of those tickets appears in the developer-sourced Arabic record, and several fail on their face. EGP 1,164,000 against the smallest published unit implies roughly EGP 25,900 per square metre, an order of magnitude below the EGP 170,000 the developer publishes, and that same figure has been copied across at least two sites. A further page publishes a per-metre ceiling of EGP 180,000 that the developer-sourced record does not contain. The practical rule is simple: treat every circulating ticket for this mall as unverified, and price the unit yourself from its area multiplied by the confirmed rate.

The payment plan and what it costs per month

Exactly one payment structure is published, so there is no second plan to weigh it against and no trade-off to calculate between a shorter and a longer tenor. The terms are as follows:

  • Contract down payment starting from 15% of the total unit value.
  • The remaining balance in instalments over a period reaching six years.
  • Reservation fees starting from EGP 50,000 for retail units and offices.
  • The option to raise the down payment in order to shorten the term or reduce the monthly instalment, with no alternative schedule published.

Put numbers against that. On the EGP 10,000,000 headline, the 15% down payment is EGP 1,500,000 and the balance of EGP 8,500,000 spread across 72 months works out at roughly EGP 118,056 a month. A 60 m² retail unit priced at the stated rate, EGP 10,200,000, needs EGP 1,530,000 down and about EGP 120,417 a month. A 45 m² office at EGP 7,650,000 needs EGP 1,147,500 down and about EGP 90,313 a month, while the 120 m² office at EGP 20,400,000 runs to EGP 3,060,000 down and roughly EGP 240,833 a month. The source gives no interest rate, so these are straight-line divisions of the published balance.

There is a timing consequence buyers routinely miss. Handover is expected in 2028 while the instalment term runs six years, so a contract signed in 2026 finishes paying in 2032, roughly four years after the keys arrive. That gap is not a defect, and it can work in the buyer’s favour if the unit is leased from handover, because rental income overlaps the tail of the payment schedule. It does mean the unit is not debt-free at handover, which matters if the plan is to resell soon after delivery.

Finishing standard and handover date

Units at Pixel Business Center New Cairo are delivered semi-finished, not fully finished. That distinction carries real money, because a semi-finished commercial or medical unit needs a fit-out budget the purchase price does not cover, and the source publishes no allowance for it. For a bank branch, a branded retail outlet or a clinic the arrangement is usually preferred anyway, since each of those tenants imposes its own interior specification and internal layout and would strip a developer’s finish out regardless.

Three of the larger listing pages state that the mall is delivered fully finished, and one goes further and specifies air conditioning included. Nothing in the developer-sourced record supports either claim, and that record is explicit that the handover standard is semi-finished. A fully finished quote and a semi-finished quote are not the same product, so anyone shown the higher figure should ask exactly which specification is being priced and where it is written into the contract.

Handover is expected during 2028, roughly three and a half years from contracting. The source flags that date as circulating rather than contractually guaranteed, and the wider market cannot agree on it. Two listing pages also say 2028, one says 2027, one says handover falls within four years, one says within three years, and two publish no date at all. That spread is reason enough to treat the year as unconfirmed until it appears in the reservation contract, and no delay penalty or compensation clause is published anywhere. The long build window does carry one practical benefit, since it lets a buyer pay down a substantial share of the unit value before the unit needs to be fitted out and operated.

Facilities and building services

The services package is built around a working building rather than a leisure destination, and it serves the retail, administrative and medical units together.

  • Electronic gates regulating entry and exit with accurate visitor tracking.
  • Smart control systems across the building’s utilities, specified to fourth-generation mall standard.
  • Parking across both basement levels, keeping demand off the North 90th Street kerb.
  • Modern lifts and escalators linking the retail and administrative floors.
  • Equipped meeting rooms serving the companies and offices inside the mall.
  • High-speed internet throughout the building.
  • Reception desks operating around the clock for companies and visitors.
  • Cafés, restaurants and ATMs serving staff and visitors to the neighbouring banks.
  • A plaza and landscaped area in front of the façade for seating and outdoor activity.
  • Dedicated children’s play areas for families accompanying visitors.
  • Round-the-clock security and guarding with advanced surveillance cameras.
  • Comprehensive maintenance and cleaning services across the facilities.

Two things are absent from that list and both are worth asking about. No facility-management or operating company is named for the mall, which is the single biggest variable in how a small commercial building performs after handover. And although maintenance and cleaning are listed as services, no maintenance fee, deposit or annual charge is published anywhere, so the cost of those services sits outside every figure on this page.

Rental yield and guaranteed returns: what is actually published

Pixel Business Center New Cairo publishes no rental yield, no return percentage, no payback period and no expected rent per square metre. The source refers only to an expected rental return supported by the banking-district location, without attaching a number, a term or any party standing behind it.

Read More: V Terrace Mall New Cairo Fifth Settlement

That absence should be stated plainly rather than filled in, because a yield figure without a rent figure behind it cannot be checked by anyone. The wider market adds nothing. Not one of the seven listing pages published for this mall carries a return percentage, an expected rent, a payback period or an occupancy assumption, and the furthest any of them goes is unquantified phrasing about optimal returns on investment and opportunities that yield returns whenever the client wants them.

No guaranteed return is offered on this project either. There is no guarantor named, no guarantee period stated and no minimum rent underwritten, so any page describing this mall as a guaranteed investment is describing something the developer has not offered. If a rental guarantee is presented to you during a sales meeting, ask for the guarantor’s legal name, the guaranteed amount, the start and end dates, and where the obligation appears in the contract.

What can be said from the published facts is narrower but more useful. The building sits inside a banking and legal cluster with an established daily population, which supports occupancy rather than a specific return, and its small footprint limits internal competition between units. Converting that into a yield requires an asking rent for the Banks Complex, and the source publishes none.

Can a unit be resold or leased before handover?

The build window running to 2028 opens a resale window once part of the unit value has been paid, which is the route an early buyer takes when entering at a lower rate and exiting as construction advances and pricing rises. Whether that is available depends entirely on the developer’s transfer conditions, and the assignment clauses in the reservation contract should be read before signing rather than after.

On the leasing side, the banking address is what makes a completed unit attractive to banks, companies and clinics looking for a branch or a base in the Fifth Settlement. Retail and service units on the lower floors typically lease faster than upper-floor offices because their visibility from North 90th Street is immediate, which is a point in favour of the 60 m² ground and first-floor stock for anyone buying purely to lease.

How it compares with other business malls on 90th Street

Two differences separate this building from the administrative malls scattered along the same axis. The first is the tenant catchment: most of those malls sit in general commercial stretches, while this one sits inside the Banks Complex next to the National Bank of Egypt and Banque Misr and opposite the Administrative Prosecution, which narrows and defines who walks past the door every working day. The second is scale, since 3,700 m² at 25% coverage produces fewer units than the larger developments and therefore less internal competition for the same customer.

The trade-off runs the other way for anyone who wants a destination. Larger malls on the axis carry wider entertainment offerings and a deeper restaurant mix, and a small business centre with a forecourt cannot match that. If the buying case is a specialised work address with guaranteed daily footfall from a specific professional population, this footprint is an advantage. If the case is a shopping destination that pulls visitors from across New Cairo at the weekend, it is not.

Safwa Urban Development, the developer behind the project

Safwa Urban Development, trading as SUD, is an Egyptian joint-stock company founded in 1996 by Mohamed Shalaby and Medhat Shalaby, giving it close to three decades in the Egyptian market. Its portfolio spans residential, commercial, administrative, medical and educational assets, and its official site lists more than twenty projects. A separate record attributed to the Egyptian Businessmen’s Association counts twenty-five, and because the two figures disagree neither is presented here as settled.

In the New Administrative Capital the company built Capital Heights 1, a 50-feddan residential community at 20% coverage, and Capital Heights 2 across 250,000 m², alongside Financial Hub in the financial district and the Capital Hub 1 and 2 malls on the central axis. In Obour City it delivered the High City compound and its mall, and in Mansoura it built the Safwa Elegance tower together with a series of medical and educational buildings and the Safwa International Schools. Its coastal work includes the Sunset resorts in Ras El Bar and New Damietta, and The Pearl in New Mansoura sits on 60 feddans with a 550-metre Mediterranean frontage.

Read More: FCC Fifth Settlement, Mall New Cairo

That record is the most relevant thing a buyer can weigh here, because the risk in an off-plan commercial unit delivering in 2028 is execution risk rather than location risk. A developer that has completed commercial and administrative buildings across several cities and sectors carries a different profile from one launching its first mall. Safwa Urban Development also markets this building under its own house naming as SUD PIXEL Business Center, which is the spelling to expect on the developer’s own materials.

Who this mall suits, and who it does not

The buyer this project fits is an investor acquiring a retail unit or an office for income in a location where occupancy is driven by an established professional population rather than by a new district filling up. It also fits a doctor or a consultant buying to occupy, because a 45 m² clinic or office inside the Banks Complex reaches patients and clients from across the Fifth Settlement without depending on a shopping destination forming around it. The low coverage ratio and the small floor plate reinforce that case by keeping the number of competing units inside the building down.

It fits less well in three situations. A buyer who needs income soon should note the 2028 handover and the instalment tail running past it. A buyer comparing purely on rate should weigh EGP 170,000 per square metre against cheaper stock in less established parts of New Cairo and decide whether the banking address justifies the premium. And a buyer who wants a documented return should recognise that this project publishes none, so any yield presented to them originated somewhere other than the developer.

This analysis is for guidance based on the published figures and is not investment advice.

What the source does not publish

Being clear about the gaps is more useful than filling them. The record for Pixel Business Center New Cairo carries no total unit count, no built-up area figure, no maximum area for the retail or clinic rows, no per-activity price row, no maintenance fee or deposit, no discount schedule, no interest rate behind the instalment plan, no delay penalty, no licence or permit reference, no named engineering consultant and no facility-management or operating company.

It also publishes no distance in kilometres or minutes to any landmark, which is why this page describes the location by adjacency instead. Each of those blanks is a question to put to the sales team in writing, and each answer should appear in the reservation contract rather than in a brochure.

Frequently asked questions

When does Pixel Business Center New Cairo deliver?

Pixel Business Center New Cairo is expected to hand over during 2028, roughly three and a half years after contracting. The source describes that year as circulating rather than contractually guaranteed, another listing publishes 2027, and no delay penalty is stated, so confirm the date in the reservation contract.

Is the mall finished or semi-finished?

Pixel Business Center New Cairo delivers its units semi-finished, letting each bank, company or clinic install its own interior specification and layout. Claims that the mall is fully finished appear on listing sites but are not supported by the developer-sourced record, and no fit-out allowance is published alongside the price.

What is the down payment and instalment plan?

Pixel Business Center New Cairo sells on a down payment starting from 15% with the balance over up to six years, and reservation fees from EGP 50,000. On the EGP 10,000,000 headline that is EGP 1,500,000 down and roughly EGP 118,056 monthly across 72 months.

What is the smallest unit in the mall?

Pixel Business Center New Cairo publishes 45 m² as its smallest unit, available as an upper-floor office or clinic, while retail units start at 60 m² on the ground and first floors. At the published rate a 45 m² unit computes to EGP 7,650,000, below the advertised starting price.

The short version

Pixel Business Center New Cairo trades on one genuinely scarce asset, a 3,700 m² plot inside the Banks Complex with frontage on North 90th Street, built at 25% coverage into a nine-level business address with units from 45 m². It is backed by a developer active since 1996, sells from a 15% down payment over six years, and hands over semi-finished around 2028. The published starting price does not reconcile with the published rate, and no yield is stated, so ask for a priced inventory row before committing. To check current prices or arrange a viewing, get in touch through the form on this page.

REVIEWED BY

Reviewed by

Not sure where to start?

Tell us your budget and needs, and our team will recommend the best options for you within 24 hours.